永久免费入口国产精品 噜噜噜噜噜噜噜噜噜噜噜噜精品 亚洲精选在线观看 AV卡通动漫亚洲

To provide customers with systematic
and intelligent water treatment solutions
Current location: Home Page > News > Industry Trends
What necessary investigations should be made before
Time:2021-07-08 10:01:49
Article release:Admin
Original author:Unknown
Source:Internet

What necessary investigations should be made before screening corrosion and scale inhibitors


As we all know, corrosion inhibitor is a kind of substance added to water that can interfere with the electrochemical action of corrosion and can prevent or reduce the corrosion rate of metal. Before using experimental verification, we should master the actual situation on the site and conduct a comprehensive investigation on the circulating cooling water system to be processed. This is also an important basis for Ande technology to choose recycled water agents. The specific methods are summarized as follows:




(1) Water quality




(1) Understand the source water is surface water or groundwater, whether it is polluted. Groundwater shall be analyzed quarterly for not less than one year. If there are several Wells, the water quality of each well should be known. For surface water, complete monthly analysis data of not less than one year should be collected.




(2) Supplement water quality to understand whether the raw water, after pretreatment and pretreatment methods, the use of flocculant or coagulant varieties. Full monthly water quality analysis data of not less than one year shall be collected. '




(3) water quality of circulating cooling




If the circulation system has been in operation, the on-site circulating water quality data can be directly used as the basis for selecting the formula. However, data should be selected when the concentration multiple is stable, at least monthly data for a year. The data at natural pH values should be known as far as possible. '-




(2) Design data of circulating cooling water system




Need to understand the type of cooling tower, circulating water FFI (m3/h), the system 'volume V (m3), the design of inlet and outlet tower water temperature (°C). It is also necessary to know the concentration multiple possible for the system and the effluent B(m3/h), wind-blown loss D(MVh) and replenishment M(m3/h) at the operating multiple. And understand the annual temperature, humidity and water temperature trends. ,




The average residence time of the agent in the system, T[V7(B+D)], should not exceed 50h in order to prevent the agent from decomposing or precipitating from hydrolysis.




(3) Data and process characteristics of the water cooler




Need to understand all the data of water treatment cooler, including the number, model, structure, material, thermal strength, process medium inlet and outlet water temperature, water flow rate and other issues.




(4) Understand the surrounding discharge environment and air pollution, understand the environment of the area through which sewage flows after discharge, whether there are agricultural crops, aquatic crops and the final discharge water area, etc., all of which will affect the stability of the circulating water system.



Label:
久久国产加勒比精品无码| 国产视频精品免费视频| 两性色午夜免费视频| 久久婷婷久久一区二区三区| 少妇人妻无码专区视频| 欧美va一级视频| 亚洲成人三级在线观看| 国产精品BACK| 亚洲2020高清无码| 国产视频专区一区| 久久免费簧片视频一区| 国精品无码一区二区三区免费视频| 欧美日韩国产综合新一区| 欧美亚洲另类在线观看第一| 久久久久久人妻一区二区三区| 亚洲第一无码精品一区| 久久久精品一区 中午字幕 毛片| 欧美日韩中文国产乱伦一区| 亚洲精品变态另类虐交| 亚洲永久无码精品放毛片| 欧美亚洲国产人成aaa| 自拍美利坚第一页不卡| 国产免费午夜A无码V视频| 国产极品美女到高潮| 三级三级久久三级| 深夜免费A级毛片久久| 久久精品中文字幕无码| 亚洲综合另类视频在线观看| 亚洲精品无码永久在线观看性色| 国产乱人伦在线播放| 精品无码一区二区三区四区久久久| 中文字幕人妻第一区| 国产欧美另类久久久精品图片| 亚洲成A人V欧美综合天堂 | 国产午夜在线观看| 中出人妻中文字幕无码| 久久国产乱子伦精品免费不卡| 中文字幕亚洲综合久久综合| 亚洲专区av在线| 99久久最新网址| 国产欧美日韩精品久久久久久|